Coastal Overseas Property in Egypt, Hotel for sale, Hurghada, CAIRO .MOHANDSEN, 2 750 000 EUR
Condition: Finished, Furnished & Equipped
Storeys: 5
Built: 2
Living space:500 m²
Land:1070 m²
Price:2 750 000 EUR
Details: Distance to Airport: 15 km, Distance to Town Center: 5 km,
Address: CAIRO .MOHANDSEN, Hurghada
More Info: - The hotel consists of five roles (landslide - mezzanine - XII - XIII - XIV)
- The front of the hotel overlooking the Hijaz on the field engineers
- The building of reinforced concrete structure 0
Description:
- front overlooking the hotel's main field of the Hijaz
- Facades overlooking other corridors Interior introduced a 3-meter
- Take up the hotel wall 3 meters away from the vicinity of the three bodies being
- The hotel consists of five roles (landslide - mezzanine - XII - XIII - XIV)
Ground Floor:
Includes entrance to the hotel, kitchen, laundry room and guard room for pumps and water lifting 0
Mezzanine role:
Includes the reception of the hotel and offices for administration and reception hall 0
The XII and XIII:
Includes 20 rooms with all the guests 0
XIV role:
Includes a kitchen - Restaurant - Cafe and Shop swimming pool, tennis court (with) Terrace in the hotel
The number 3 elevator to reach the top floors, including 2 for guests and a lift elevator staff 0
Is the use of a Water Schiller 51 tons of central air-conditioning unit 0 guests
Finishing the hotel
1 - Ground Floor:
1-1 Portlet:
- Flooring: Marble size 50 × 50
- Walls: There is also a marble Texier Banohat mirrors and hanging Abalik Top 0
- The role of peace leading to the mezzanine: a composite of marble and copper Cobsth
2-1 lanes around the hotel:
- Floor: tile sidewalks
- Walls: blank Trtch
3-1 Kitchen:
- Flooring: Ceramic
- Walls: Qeichany white size 15 × 15
- Ceiling: Meses
- Lighting: ÙƒØ´Ø§ÙØ§Øª Florsnt
4-1 laundry:
- Flooring: ceramic tiles of various types
- Walls: Qeichany size 15 × 15
- Bishop: Meses
5-1 room pumps:
- Walls: blank Tkhchin 0
- Floor: tile Sanjabi 0
- Equipment: pumps, particularly the number of hotel 2 + 2 pumps, particularly the number of real estate
2 - the role of mezzanine:
Consists of enough Schöpp external + 2 the number of service and Chtaibha as follows:
1-2 Schöpp enough:
- Flooring: Marble size 50 × 50 cm
- Walls: the covering of marble
- Bishop: painting plastic
- Beds of flowers: the covering of marble
- Containers: the covering of marble
2-2 bathrooms:
- Flooring: Ceramic
- Walls: ceramic tiles up to ceiling level of abdominal
- Bishop: painting plastic
- Devices for each session: Arval basin within a marble shelf Ideal Stanerd + Kumbenishn
3-2 reception hall + 2 Room Office + Reception, Chtaibha containers as follows:
- Flooring: carpet
- Walls: Paint for the offices of the binding of wood reception
- Bishop: plastics, paints
- Windows: aluminum
- Doors: Aluminum
4 - the XII and XIII:
1-4 - each consisting of 20 rooms for guests and Balhamam Chtaibha as follows: --
- Alorzaiat: moquette
- Walls: painting oil
- Bishop: oil paint
- Doors: wood, lacquer painted Bbueh
- Windows: aluminum
2-4 - bath procedure:
- Walls and floors: Ceramic
- Ceiling: paint, plastic
- Devices: bathtub + Kumbenishn + Bedie + Basin
5 - the role XIV:
Consists of a kitchen + restaurant + and Cafe Shop Terrace and swimming pool, tennis + toilets + +6 wing rooms and finishing as follows:
1-5 - Kitchen:
- Walls: Qeichany white 15 × 15 cm
- Flooring: Ceramic
- Bishop: painted oil
- Windows: aluminum
2-5 - Restaurant and Cafe Shop:
- Flooring: carpet and good-quality
- Walls: painted wood binding
- Bishop: oil paint
- Doors: aluminum colored transparent glass is empty terrace overlooking the
- Windows: aluminum
3-5 - Hall concerts:
Equipped for conferences, concerts, or the establishment of
4-5 - toilets:
- There are toilets for men and women
- The men's water contains: Ovalle within the shelf basin marble + number 2 Kumbenishn + 2 urinal
- Women's water cycle contains: Ovalle within the shelf basin marble + number 2 Kumbenishn
- Flooring: Ceramic
- Walls: ceramic tiles and aluminum Qatua there between Ahamamin
4-6 - distribution roads:
- Flooring: ceramic tiles 40 × 40
- Ceilings and walls: painted
VI: brushes guest rooms:
Have been laid out each room 2 single beds full mattress 1 × 2 m + wheel Dilftin wood and wood discharged comprehensive chairs + 2 wood chair upholstered Alclth + metal carrier bags + 2 Komedino wood + table Astanls also includes a mini-refrigerator cutting Zanussi + Telephone Service + Service TV 0
(Note: There are 4 bed rooms and one-size 6,1 × 2 m)
- The receptionist at the hotel:
- In the summer months from July to September up to about 98%, and the majority of the inmates of the Arab brothers 0
- For the winter months Vttnoa of foreign nationalities (South Africa - Ross) or contracts with banks to provincial employees (to attend training courses in Cairo), in addition to students from different nationalities 0
- The ratio of reception of 60% to 70%
- m